General Motors

Introduction

In our research we found that today every organization is facing problem of sewage and sanitation. And they are using the traditional method for its solution which is less effective and more costly and it has many other hurdles too.

The meeting was done between GENERAL MOTORS And AS renewable Energy pvt. ltd. in the presence of Mr. Sanjay Jain from General motors and Mr. Sunil Yadav (Marketing Executive) from A S renewable Energy pvt. ltd. The conclusion came as to give demo to judge effectiveness of the product. So according to the detail provided by General Motors officials, we did sample dosing in the canteen chamber.

As we have develop an innovative solution (draynzyme) for such problem which is effective, less costly and better in many ways.

To provide this benefit to GENERAL MOTORS we have visited the plant on 05-11-2014.

visit

Visit-1

L&T plant, canteen chamber, industries like Chemical, Pharma, Oil & Gas, food heavy engineering, Dranzyme

Visit-1

We visited the L&T plant on 5th august 2014 and found three major problem in canteen.

Appalling & disturbingly foul odour

Undigested sludge in canteen chamber

Top layer of sludge was hard

Visit-2

General Motors officials, Draynzyme Fog Busters, Pack Booster

Visit-2

OUR SOLUTION We applied the combined dosing of 3 DRAYNZYME FOG BUSTERS pack with Booster Pack on 11-11-2014 Based on Approx Flow was give by General Motors officials.

Visit-3

Observation of L&T Plant,industries like Chemical, Pharma, Oil & Gas, food heavy engineering, Dranzyme

Visit-3

OBSERVATION
When we visited the plant on 27-11-2014 we found that the odour was removed. And the level of sludge on 27th November was soft and become low as compare to 5th-11-2014.

Conclusion

We realize the following changes as compare to first visit.

Before dosing of Draynzyme

  •   Appalling & disturbing foul odour.
  •   Top layer of sludge was very hard.
  •   Excessive amount of undigested sludge.
  •   Due to very hard level of sludge, no amount of water was visible

After dosing of Draynzyme

  •   The foul odour was REMOVED.
  •   The sludge layer becomes SOFTENED.
  •   The sludge digestion process started.
  •   After dosing we can see water level up with degraded sludge.